Time-Constrained Project Scheduling

T.A. Guldemond, J.L. Hurink, J.J. Paulus and J.M.J. Schutten
Abstract | Instance Description | Weekly Pattern and Costs | Summary of the Results | Details | Contact

Summary of the Results

b=1.0 b=0.9
Work Maximum Average Objective # with Maximum Average Objective
JobsInstances Content CT(s) CT(s) value cost=0 CT(s) CT(s) value
30 480 2,310.7 26.1 2.9 3.2 294 55.1 4.5 58.6
60 480 4,562.9 241.7 17.2 13.4 276 303.4 24.7 124.4
90 480 6,812.2 932.7 53.0 22.6 282 845.3 73.9 180.8
120600 9,073.5 2,163.4 308.3 72.4 75 2,798.2 362.2 326.6